Search
All Products
    Menu Close

    DryLoo™ Installation Overview

    dryloo logoComprehensive installation instructions are supplied with every DryLoo™ system, and installation support is available to guide you through the process.

    The DryLoo™ chamber may be installed either buried or placed at ground level, depending on your site requirements. Unloading and placement typically require heavy-lifting equipment—such as a forklift, crane or excavator—and the unit is secured using slings or lifting clutches. For maximum solar-driven ventilation, orient the flue to face north and best capture the sun’s heat.

     

    WCTNZ® | Waterless Composting Toilets NZ Limited | Copyright 2025 ©