GreyFlow™ installs are tidy when you follow the staged sequence: place/trim the pit, plumb inlet/overflow, fit filters and pump, then connect the sub-surface irrigation zone(s) below mulch. Finalise electrics and commission with a flush before bringing the irrigation online. A licensed plumber must perform PVC connections and sign-off for consented works.
The PS pathway splits into Builder’s Kit (pre-lay carcass with in/out/overflow penetrations) and a Finishing Kit (manual or auto filtration + pump/controller) at fit-off. This sequencing lowers construction cost and avoids re-work after paving/landscaping.
The PRO pit is depth-adjustable (cut to height) for easy alignment with existing drains. After trimming the riser, install filters, set the submersible pump, run conduit/cables to the cabinet (auto) or power point (manual), and flush the system before coupling to dripline.
Use GreyFlow™-approved dripline and manifolds; keep run lengths and station splits within spec (e.g., use the rotor/indexer for multi-station distribution). Signage for “greywater in use” is required; keep discharge below mulch/soil.
Discharge must be sub-surface; isolate kitchen flows; provide a dedicated power supply; and shut systems down during heavy rain or runoff conditions where required by council rules.
WCTNZ® | Waterless Composting Toilets NZ Limited | Copyright 2026 ©
Monthly News: Current affairs in NZ wastewater
Monthly Promotion: Special & one-off deals
Monthly The Humanist: Tips, tricks & advice on composting toilets