Search
All Products
    Menu Close
    SKU: LC-NZ-PAC/AIR-SGL-CM8-SOL
    A compact AirCube™ single-cubicle deployment package for remote public toilet sites, supplied as a project-scoped building package with FRP/GRP construction, Clivus Multrum™ CM8 composting system, solar package, stainless steel pedestal, furniture package, foundation/fixing options and shipping crate.
    POA – Price on Application
    Products
    AirCube™ deployment package

    LooCube™ | AirCube™ Single Deployment Package

    A compact single-cubicle AirCube™ building package for remote public toilet sites where access, weight, installation speed and self-contained sanitation matter.

    This package combines an elevated AirCube™ building kit, Clivus Multrum™ CM8 composting toilet system, stainless steel pedestal and furniture package, foundation/fixing options, domestic solar package and shipping crate into one project-scoped deployment package.

    Building
    Single cubicle
    Elevated AirCube™ package
    Waste system
    CM8
    8,000 uses per annum
    Power
    Solar package
    Domestic solar system
    Supply
    POA
    Project-scoped package
    Best suited for

    Remote and public toilet deployment

    • Remote parks, trails, reserves, work sites and public locations where conventional servicing is limited.
    • Small public-use facilities needing a single cubicle and a self-contained composting toilet pathway.
    • Projects where prefabrication, lighter-weight materials and faster deployment are commercially important.
    • Sites where long-life, low-maintenance FRP/GRP construction is preferred over traditional building methods.
    Package inclusions

    Included and scoped options

    SKU
    LC-NZ-PAC/AIR-SGL-CM8-SOL
    Building
    AirCube™ Single Floor >1000mm AGL Building, single cubicle.
    Access package
    Stairs including stainless steel handrail and balustrade package for elevated building access, as scoped.
    Composting system
    Clivus Multrum™ CM8 composting toilet system, rated at approximately 8,000 uses per annum.
    Pedestal
    Stainless Steel Pardelo pedestal including soft-close seat.
    Furniture package
    Standard stainless steel furniture package.
    Foundation / fixing options
    Selected foundation pathway is included in the project scope. Options may include bolt-to-slab / concrete-paver base fixing, screw piles or concrete piles, subject to site and engineering requirements. Screw pile driver excluded unless separately selected.
    Power package
    LooCube™ Domestic Solar System.
    Water supply options
    Optional water tank package can be scoped as gravity-fed or pumped supply, with stand options where required.
    Freight preparation
    Shipping crate included.
    Detailed package specification

    AirCube™ Single package details

    Package type
    AirCube™ Single Deployment Package.
    Building type
    AirCube™ Single Floor >1000mm AGL Building.
    Cubicles
    Single cubicle.
    Building construction
    FRP/GRP building kit, supplied as a project-scoped package.
    Access
    Stairs including stainless steel handrail and balustrade package, as scoped.
    Toilet system
    Clivus Multrum™ CM8 composting toilet system.
    Annual system rating
    Approximately 8,000 uses per annum.
    Pedestal
    Stainless Steel Pardelo pedestal including soft-close seat.
    Furniture
    Standard stainless steel furniture package.
    Foundation / fixing options
    Selected foundation pathway included in the project scope. Options may include bolt-to-slab / concrete-paver base fixing, screw piles or concrete piles, subject to site and engineering requirements. Screw pile driver excluded unless separately selected.
    Power package
    LooCube™ Domestic Solar System.
    Water supply options
    Optional water tank package can be scoped as gravity-fed or pumped supply, with stand options where required.
    Freight / packing
    Shipping crate included.
    This is a Price on Application deployment package. Final inclusions, foundation method, water supply, access, colours, freight pathway and certification requirements are confirmed during the project scope.
    Building kit construction

    FRP/GRP construction for lightweight deployment

    All buildings and ramps are supplied as an FRP/GRP building kit. Primary structural elements including frame, floor, stair assembly, ramps and transitions are manufactured from fibre-reinforced polymer for high strength, low weight, slip resistance, corrosion resistance, termite resistance and low maintenance.

    • Flat-packed for transport.
    • Pre-cut and pre-drilled sections with fixings and labelled components.
    • Covered veranda and skillion / mono-pitch roof profile.
    • External walls and roof sheeting selected from the standard colour range.
    • Stainless steel fixtures, fittings, handrails and FRP grated balustrades for elevated buildings.
    • Lockable lined doors with door closers.
    Compliance context

    Designed to support New Zealand project approval

    Base engineering and documentation are prepared in Australia to relevant Australian Standards and supplied to assist with New Zealand consenting. Final New Zealand compliance, including any Producer Statements, site-specific foundations and anchorage, must be certified to the New Zealand Building Code by suitably qualified New Zealand professionals.

    Final specifications, inclusions, colour options, foundations and certification requirements are project-specific and confirmed during the project scope and order process.
    Product images and renders are illustrative only. Final configuration, colour, access, foundation, water supply and system details are confirmed in the written project quotation and order documentation.
    Project process

    Price on application deployment package

    AirCube™ deployment packages are scoped as Price on Application projects. WCTNZ® will discuss site access, expected use, service model, access requirements, foundation approach, water supply needs, colour selections and final delivery pathway before confirming the package specification.