Search
All Products
Menu Close

Trelino® Installation Overview

Trelino® Composting Toilets Company Logo

Installation Preparation: Tips to Streamline the Process

  • Check Your Package: Begin by thoroughly checking all the components in your package.
  • Prepare a List: Make a detailed list of any additional parts, materials, or tools you need for the installation.
  • Gather Supplies: If you did not order the full kit package from us, pick up the remaining materials from your local supplier.
  • Safety First: Ensure you have the appropriate safety gear before starting any installation work.
  • Follow the Manual: Always refer to and follow the manufacturer’s installation manual for accurate step-by-step guidance.
  • Allow Extra Time for DIY: If you’re installing the system yourself and are new to DIY projects, allow yourself twice as much time as you anticipate.

Installation Overview

Systems: Evo S, Evo M, Evo L (Urine Diversion to Container systems)

Type of structure: 

  • Primary use: RV, camping
  • Secondary use: outhouse, sleepout, hut, anywhere off-grid

Difficulty level: Easy

Timeframe: 1–2 hours

Installation array:

  1. Vent stack for venting to the exterior (optional/for permanent installations)
  2. Power connection (optional/for vented, permanent installations)

Who can install: DIY, handyman, builder, plumber

Site requirements: no particular site requirements

Tools required: 

  • Drill (optional/if mounting to the floor)

Downloadable Manufacturer's Manuals for specific installation procedure per system: 

  • Trelino® Evo S
  • Trelino® Evo M
  • Trelino® Evo L

 

WCTNZ® | Waterless Composting Toilets NZ Limited | Copyright 2025 ©